Saturday, October 26, 2013

Caprine Towers

We have soooo many things that need to be done, so I took an extra day off work this week and built the goats a play structure. Probably should have moved the paint to the basement, or worked on the furnace install or glazed some windows, but that's not how I roll.

Below, Mo is testing the materials. The thing is five pallets cobbled together with a few boards. It cost nothing (even the nails are recycled). It is not beautiful, but I hope it keeps Mo out of trouble. A bored goat is a bad thing.



They can clip-clop up the ramp and across the bridge, tap dance on the main tower bit, then do a tightrope walk over to the brick pile where they play king of the hill. Or they could look in the window at us and make snarky comments.


We did get some paint moved to the basement so it won't freeze. I rigged a heavy-duty kid's sled with a cargo box and long rope, loaded it with paint, and slid it down the 20 steep concrete stairs where C. unloaded it into the boiler room. It's slow, but not as slow as stumping up and down those steps with armloads of paint cans. Now just to do that a hundred more times before it gets really cold out there.

Sunday – there's a nasty cold wind blowing outside, and it's supposed to get down to 22 tomorrow night, and 19 the next. Guess who is moving cans of paint over the next 24 hours? The goats! Right. 

I'm wondering why I didn't get more done when it was warm and balmy out. 



No comments:

Post a Comment