Tuesday, February 5, 2013

Tour, continued



























This is the gym, a huge space. The worst of the roof leaks is here, and the floor is rolling and a little spongy. The ceiling is 19 feet high. Below, behind M you can see the door that opens into nothingness (was the scoreboard there?) and various construction and destruction materials.




























Below is the abbreviated hall inside the southwest doors. It's all new materials - sheetrock, particle board - and the bathroom at the end interrupts the hall that used to run completely through the building. The gym is way down there off to the left, Unit 2 on the right. The nearest doors open into the two "new" classrooms, added in 1955.



No comments:

Post a Comment